13001-13051 Bradley Ave
This feature is unavailable at the moment.
We apologize, but the feature you are trying to access is currently unavailable. We are aware of this issue and our team is working hard to resolve the matter.
Please check back in a few minutes. We apologize for the inconvenience.
- LoopNet Team
thank you
Your email has been sent!
13001-13051 Bradley Ave
18,268 SF of Industrial Space Available in Sylmar, CA 91342
Highlights
- Great Manufacturing/Distribution Building
- 400 Amps, 277-480 Volt, 3 Phase Power (Expandable)
- Longer Term Available
- Excellent Access to the 5, 405, 118, 210 & 14 Freeways
- Large Loading Door
Features
Clear Height
14 ft
Level Access Doors
4
Exterior Dock Doors
4
Levelers
1
Standard Parking Spaces
167
all available space(1)
Display Rent as
- Space
- Size
- Term
- Rent
- Space Use
- Condition
- Available
14' Minimum Clear Height 400 Amps, 277-480 Volt, 3 Phase Power 18' Wide Loading Door Two (2) Restrooms
- Lease rate does not include certain property expenses
- 1 Level Access Door
- Includes 300 SF of dedicated office space
- Private Restrooms
Space | Size | Term | Rent | Space Use | Condition | Available |
1st Floor - 13051 | 18,268 SF | Negotiable | £11.28 /SF/PA £0.94 /SF/MO £121.43 /m²/PA £10.12 /m²/MO £206,088 /PA £17,174 /MO | Industrial | Full Build-Out | 30 Days |
1st Floor - 13051
Size |
18,268 SF |
Term |
Negotiable |
Rent |
£11.28 /SF/PA £0.94 /SF/MO £121.43 /m²/PA £10.12 /m²/MO £206,088 /PA £17,174 /MO |
Space Use |
Industrial |
Condition |
Full Build-Out |
Available |
30 Days |
1st Floor - 13051
Size | 18,268 SF |
Term | Negotiable |
Rent | £11.28 /SF/PA |
Space Use | Industrial |
Condition | Full Build-Out |
Available | 30 Days |
14' Minimum Clear Height 400 Amps, 277-480 Volt, 3 Phase Power 18' Wide Loading Door Two (2) Restrooms
- Lease rate does not include certain property expenses
- Includes 300 SF of dedicated office space
- 1 Level Access Door
- Private Restrooms
Manufacturing FACILITY FACTS
Building Size
83,367 SF
Lot Size
3.90 AC
Year Built
1958
Construction
Masonry
Water
City
Sewer
City
Gas
Natural
Power Supply
Amps: 400-1,200 Volts: 277-480 Phase: 3 Wire: 4
Zoning
M2-1 - Heavy Manufacturing
1 of 1
1 of 5
VIDEOS
3D TOUR
PHOTOS
STREET VIEW
STREET
MAP
1 of 1
Presented by
13001-13051 Bradley Ave
Already a member? Log In
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.