This feature is unavailable at the moment.
We apologize, but the feature you are trying to access is currently unavailable. We are aware of this issue and our team is working hard to resolve the matter.
Please check back in a few minutes. We apologize for the inconvenience.
- LoopNet Team
thank you
Your email has been sent!
1415 S Cherry Ave
9,225 SF of Industrial Space Available in Tucson, AZ 85713
Highlights
- Central Tucson location
- Easy access to I-10 and I-19
- Corner Lot
- All new HVAC units by October 1, 2024
Features
all available space(1)
Display Rent as
- Space
- Size
- Term
- Rent
- Space Use
- Condition
- Available
100% HVAC facility, ideally suited for manufacturing, assembly, engineering, optical sciences, laboratory, machine shop, etc.
- Lease rate does not include utilities, property expenses or building services
- 1 Level Access Door
- 1 Loading Dock
- Corner Lot
- 100% HVAC
- Includes 3,230 SF of dedicated office space
- Space is in Excellent Condition
- Central Air Conditioning
- Centrally located
Space | Size | Term | Rent | Space Use | Condition | Available |
1st Floor | 9,225 SF | 5-12 Years | £12.60 /SF/PA £1.05 /SF/MO £116,230 /PA £9,686 /MO | Industrial | Full Build-Out | Now |
1st Floor
Size |
9,225 SF |
Term |
5-12 Years |
Rent |
£12.60 /SF/PA £1.05 /SF/MO £116,230 /PA £9,686 /MO |
Space Use |
Industrial |
Condition |
Full Build-Out |
Available |
Now |
1st Floor
Size | 9,225 SF |
Term | 5-12 Years |
Rent | £12.60 /SF/PA |
Space Use | Industrial |
Condition | Full Build-Out |
Available | Now |
100% HVAC facility, ideally suited for manufacturing, assembly, engineering, optical sciences, laboratory, machine shop, etc.
- Lease rate does not include utilities, property expenses or building services
- Includes 3,230 SF of dedicated office space
- 1 Level Access Door
- Space is in Excellent Condition
- 1 Loading Dock
- Central Air Conditioning
- Corner Lot
- Centrally located
- 100% HVAC
Property Overview
Former manufacturing plant. One grade door and one dock door. All new HVAC Air conditioners will be installed by October 1, 2024. A total of eight units replaced. Well maintained facility. All new parking lot and vertical curbs were installed with new base soil.
Warehouse FACILITY FACTS
Presented by
1415 S Cherry Ave
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.