Contractor Special . . . Building has been taken down to a shell. Improvements already made: New Roof, New Windows, Rough Framing, Electrical* and some plumbing. New Owner will need to finish HVAC, drywall/insulation and the "build out" (floors, appliances & bathrooms) for 3 apartments. *The new Electrical Service that was installed will allow for separate meters for the 3 apartments on the 2nd floor and the retail tenant on the 1st floor. Parking area for approx 8 cars. Property is located Downtown, within the inner loop. Close to Eastman School of Music, Main St, East Ave. The 2nd phase of the inner loop project should be starting within a year which will fill in the roadway with building high rises and apartments coming to the area.