This feature is unavailable at the moment.
We apologize, but the feature you are trying to access is currently unavailable. We are aware of this issue and our team is working hard to resolve the matter.
Please check back in a few minutes. We apologize for the inconvenience.
- LoopNet Team
thank you
Your email has been sent!
Build to Suit Mining or Tier 3 Data Center 500 N 4th St
200,000 SF of 4-Star Light Industrial Space Available in Coshocton, OH 43812
Highlights
- Environmentally Sustainable Design for High Performance Compute
- Mining, Data Center and High Performance Compute – all available on site.
Features
all available space(1)
Display Rent as
- Space
- Size
- Term
- Rent
- Space Use
- Condition
- Available
125 Acres- 200 MW of Capacity - Established Bitcoin Operations with industry leaders – 5 MW in production - 20 MW Tier III Data Center Approved Support Facilities: - Mining- 1MW Containers - Data Center – 200,000 SF Utility Power Capacity : - 50 MW Capacity avalable in 2020 - 90 MW Capacity avalable in 2021 - 200 MW Capacity available 2020 Utility Power Design: - 69 kV - 13.8 kV - 415 V - 3 Substations with Onsite Substation Site Benefits: - Existing Water Rights for Liquid Cooling 12,000,000 gallons of water per day - Supports High Performance Compute - Can support 125/kW density Electricity Power Rates: - Sub .03 kWH (AEP-Ohio) Flood Zone: - Outside 500-year flood plain Seismic: - Outside earthquake fault zone - Seismically isolated facility Remote Hands: - 1-hour response time in business hours - 4-hour response time after hours Security: - 24 x 7 x 365 - Biometric / card access - CCTV / motion sensors Fiber Providers: - AT&T, Crown Castle and Centurylink Build to Suit Design: - UPS, N+2, parallel redundant - PDU, 2N - Cooling System, 2N - Generators, N+1 - Outside 500-year flood plain Compliance: - SSAE 16 Type 2 SOC 1
- Includes 1 SF of dedicated office space
- 1 Level Access Door
- Plug & Play
- Fully Built-Out as Specialty Space
- High End Trophy Space
- 2 Loading Docks
- Mostly Open Floor Plan Layout
Space | Size | Term | Rent | Space Use | Condition | Available |
1st Floor - 1000 | 200,000 SF | 10 Years | Upon Application Upon Application Upon Application Upon Application Upon Application Upon Application | Light Industrial | Full Build-Out | 120 Days |
1st Floor - 1000
Size |
200,000 SF |
Term |
10 Years |
Rent |
Upon Application Upon Application Upon Application Upon Application Upon Application Upon Application |
Space Use |
Light Industrial |
Condition |
Full Build-Out |
Available |
120 Days |
1st Floor - 1000
Size | 200,000 SF |
Term | 10 Years |
Rent | Upon Application |
Space Use | Light Industrial |
Condition | Full Build-Out |
Available | 120 Days |
125 Acres- 200 MW of Capacity - Established Bitcoin Operations with industry leaders – 5 MW in production - 20 MW Tier III Data Center Approved Support Facilities: - Mining- 1MW Containers - Data Center – 200,000 SF Utility Power Capacity : - 50 MW Capacity avalable in 2020 - 90 MW Capacity avalable in 2021 - 200 MW Capacity available 2020 Utility Power Design: - 69 kV - 13.8 kV - 415 V - 3 Substations with Onsite Substation Site Benefits: - Existing Water Rights for Liquid Cooling 12,000,000 gallons of water per day - Supports High Performance Compute - Can support 125/kW density Electricity Power Rates: - Sub .03 kWH (AEP-Ohio) Flood Zone: - Outside 500-year flood plain Seismic: - Outside earthquake fault zone - Seismically isolated facility Remote Hands: - 1-hour response time in business hours - 4-hour response time after hours Security: - 24 x 7 x 365 - Biometric / card access - CCTV / motion sensors Fiber Providers: - AT&T, Crown Castle and Centurylink Build to Suit Design: - UPS, N+2, parallel redundant - PDU, 2N - Cooling System, 2N - Generators, N+1 - Outside 500-year flood plain Compliance: - SSAE 16 Type 2 SOC 1
- Includes 1 SF of dedicated office space
- High End Trophy Space
- 1 Level Access Door
- 2 Loading Docks
- Plug & Play
- Mostly Open Floor Plan Layout
- Fully Built-Out as Specialty Space
Property Overview
Economic Incentives Mining Incentives - Member of Ohio Manufacturer’s Association - Taxes able to be paid in bitcoin - Recognized as the most friendly mining state - Low Cost of Ownership - Full Turnkey solution and Operations on site Data Center Incentives - Tax Abatement on Hardware Purchases - Low Latency Fiber Routes to Columbus Carrier Hotels - Low Latency Fiber Route to AWS Node in Columbus - AWS Direct Connect Options Available - Proximity to leading Cloud Provider Access Points
PROPERTY FACTS
Presented by
Build to Suit Mining or Tier 3 Data Center | 500 N 4th St
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.