Calle Loeches 9,364 SF Industrial Unit Offered at £1,071,563 in Alcorcón, Madrid 28925

Some information has been automatically translated.
INVESTMENT HIGHLIGHTS
- Newly built warehouse
- Good location
- Brand new space
EXECUTIVE SUMMARY
Spectacular warehouse located in the best industrial and commercial area in Alcorcón. The property is located in the Ventorro del Cano industrial estate, in a consolidated industrial and commercial area, just 50 meters from the light rail stop. The warehouse has an area of 890 m2 distributed over two floors above ground and basement. It consists of a street floor of 380 m2 with a height of 12 meters, the first floor of offices of 280 m2 and a basement of more than 200 m2. It has a large patio, gate, lots of natural light and toilets.
PROPERTY FACTS
Price | £1,071,563 |
Unit Size | 9,364 SF |
No. Units | 1 |
Total Building Size | < 15,000 SF |
Property Type | Industrial (Unit) |
Sale Type | Investment or Owner User |
Number of Floors | 2 |
Year Built | 2020 - 2025 |
AMENITIES
- Courtyard
- Close to Public Transport
- Storage Space
- Natural Light
- Recessed Lighting
- Private Bathroom
1 UNIT AVAILABLE
Unit Size | 9,364 SF |
Price | £1,071,563 |
Price Per SF | £114.43 |
Unit Use | Industrial |
Sale Type | Investment or Owner User |
DESCRIPTION
New construction industrial building for sale and rent. Space with finished and brand new work.
The warehouse has a constructed area of 820 m2 distributed over various heights, about 400 m2 useful street floor, 200 m2 useful in the basement and 110 m2 useful first floor.
The ground floor is open plan and has an entrance of 5 meters in height and free height in a warehouse of 10 meters.
The first floor has an office area with a height of 2.80 meters with false ceilings.
The basement floor is open plan and has a free height of 3.55 meters with access from the back of the warehouse, through an access ramp on the street.
The capacity of this warehouse is 4,600 m3 of storage.
Firefighting installation already legalized, with its own tank, without having to contract the firefighting connection to Canal de Isabel II.











