Your email has been sent.
Kinfield Industrial Park San Antonio, FL 33576 108,160 - 1,847,520 sq ft of Industrial Space Available



PARK HIGHLIGHTS
- Exceptional interstate frontage and access.
- Proximity to major transportation hubs: Tampa International Airport and Port Tampa Bay.
- Prime location in Tampa Bay’s primary growth corridor with direct interstate access.
- Significant economic incentives, including long-term tax reimbursements and fast-track permitting.
- Build-to-suit flexibility with customizable layouts and loading configurations.
- Up to 3 million SF of Class A industrial space within a 780-acre master-planned development.
PARK FACTS
| Total Space Available | 1,847,520 sq ft | Park Type | Industrial Park |
| Total Space Available | 1,847,520 sq ft |
| Park Type | Industrial Park |
ALL AVAILABLE SPACES(3)
Display Rent as
- SPACE
- SIZE
- TERM
- RATE
- USE
- CONDITION
- AVAILABLE
- Lease rate does not include utilities, property expenses or building services
- 35 Loading Docks
- Space is in Excellent Condition
- Flexible Class A Industrial Space
| Space | Size | Term | Rate | Space Use | Condition | Available |
| 1st Floor | 108,160 sq ft | Negotiable | Upon Application Upon Application Upon Application Upon Application | Industrial | Spec Suite | 31/12/2025 |
I-75 and SR-52 - 1st Floor
- SPACE
- SIZE
- TERM
- RATE
- USE
- CONDITION
- AVAILABLE
- Lease rate does not include utilities, property expenses or building services
- 230 Loading Docks
- Space is in Excellent Condition
- Flexible Class A Industrial Space
| Space | Size | Term | Rate | Space Use | Condition | Available |
| 1st Floor | 1,254,400 sq ft | Negotiable | Upon Application Upon Application Upon Application Upon Application | Industrial | Spec Suite | 31/12/2025 |
I-75 and SR-52 - 1st Floor
- SPACE
- SIZE
- TERM
- RATE
- USE
- CONDITION
- AVAILABLE
- Lease rate does not include utilities, property expenses or building services
- 100 Loading Docks
- Space is in Excellent Condition
- Flexible Class A Industrial Space
| Space | Size | Term | Rate | Space Use | Condition | Available |
| 1st Floor | 484,960 sq ft | Negotiable | Upon Application Upon Application Upon Application Upon Application | Industrial | Spec Suite | 31/12/2025 |
I-75 and SR-52 - 1st Floor
I-75 and SR-52 - 1st Floor
| Size | 108,160 sq ft |
| Term | Negotiable |
| Rate | Upon Application |
| Space Use | Industrial |
| Condition | Spec Suite |
| Available | 31/12/2025 |
- Lease rate does not include utilities, property expenses or building services
- Space is in Excellent Condition
- 35 Loading Docks
- Flexible Class A Industrial Space
I-75 and SR-52 - 1st Floor
| Size | 1,254,400 sq ft |
| Term | Negotiable |
| Rate | Upon Application |
| Space Use | Industrial |
| Condition | Spec Suite |
| Available | 31/12/2025 |
- Lease rate does not include utilities, property expenses or building services
- Space is in Excellent Condition
- 230 Loading Docks
- Flexible Class A Industrial Space
I-75 and SR-52 - 1st Floor
| Size | 484,960 sq ft |
| Term | Negotiable |
| Rate | Upon Application |
| Space Use | Industrial |
| Condition | Spec Suite |
| Available | 31/12/2025 |
- Lease rate does not include utilities, property expenses or building services
- Space is in Excellent Condition
- 100 Loading Docks
- Flexible Class A Industrial Space
SITE PLAN
PARK OVERVIEW
Kinfield is a fully entitled, transformative Hines mixed-use project in Pasco County spanning 780 acres at the NW corner of I-75 and SR-52. Located in Tampa’s primary growth corridor, Kinfield will serve as a major economic hub anchored by up to 3 million square feet of industrial. Industrial users will benefit from exceptional interstate frontage and access, prevalent local labor availability, and maximum site flexibility for facility requirements. As a Hines-led master planned development, Kinfield will set a new standard for placemaking and excellence in Pasco County. Due to the project’s designation as a “Gateway Hub” within Pasco County’s Comprehensive Plan, Industrial users will benefit from an approved Economic Incentive Agreement, providing: 1) 50% ad valorem tax reimbursements for up to 20 years1 and 2) expedited construction plan and permit review.
Presented by
Kinfield Industrial Park | San Antonio, FL 33576
Hmm, there seems to have been an error sending your message. Please try again.
Thanks! Your message was sent.





